Production
At this point, a production deposit is requested to acquire all the materials and accessories and start the production.
Process
According to the volume and complexity of the product, a production timeline is established. Usually,
this process takes between 14 to 30 days.
Quality Control
As production starts, our quality control agents keep a close contact with the factory to ensure the
product guidelines as well as the production time frame are respected. If delays occur, the client is
immediately notified so they can plan accordingly.
Inspection
Once the production is completed, our quality control agents inspect goods prior to packaging and
assembly.